Our Blog

Our Build – First Lift
Our re-schedule date to start erecting the frame was quicker than we thought and the weather was kind to us.

Our Build – Corona and our build
Well, as you can imagine, things have been very quiet over the last 4 weeks with our site closing down

Our Build – Slow but steady
With building sites being able to work practising safe distancing, after a few weeks of quiet, we’ve been able to

Our Build – Finally watertight
Windows and doors are in. Some colour issues as the panel in the bottom of the door should be grey

Our Build – Disaster Strikes
Just when we thought everything was going slowly but surely and just 2 days away from having the concrete screed

Our Build – Looking more like a house
We are still waiting to hear from highways regarding the monsoon which occurred a few weeks back, so unfortunately, we

Our Build – Progress, little by little
So, we are still waiting for highways to get back to us about the flooding situation. They’ve said it can

Our Build – Gas Connection
This job had had to be postponed due to the Covid situation so it was a relief to finally get

Our Build – Electrical Connection
The beautiful weather is still with us and the last of the utilities gets connected. A rather large “joint bay”