Our Build – First Lift
Our re-schedule date to start erecting the frame was quicker than we thought and the weather was kind to us.

Our re-schedule date to start erecting the frame was quicker than we thought and the weather was kind to us.

Well, as you can imagine, things have been very quiet over the last 4 weeks with our site closing down

With building sites being able to work practising safe distancing, after a few weeks of quiet, we’ve been able to

Windows and doors are in. Some colour issues as the panel in the bottom of the door should be grey

Just when we thought everything was going slowly but surely and just 2 days away from having the concrete screed

We are still waiting to hear from highways regarding the monsoon which occurred a few weeks back, so unfortunately, we

So, we are still waiting for highways to get back to us about the flooding situation. They’ve said it can

This job had had to be postponed due to the Covid situation so it was a relief to finally get

The beautiful weather is still with us and the last of the utilities gets connected. A rather large “joint bay”