Our Build – Screed, at last!

How long I have waited for this day.  After having to abandon laying our screed due to a flood, we are finally in a position to get it done.  First, back down goes the under floor heating pipes – thank you Dave ?

From this mess

To this…If you’re wondering what the yellow square is for, it was where we had to cut a hole in the membrane in order to replace a broken insulation slab ?

 

And finally, the boys get to work. A very exciting and very cold day!  Accelerator and fibre mesh was added to the mix in order to add strength and speed up the drying process, so should be able to walk on after 2-3 days…

 

What a lovely sight. No more tip toeing around!